Find Cheap Water Well Drilling Rig, Crawler Drill Rig, Drilling Machine Water Dilling Portable on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Anchor And Other Parts > Drilling Rig Anchor 100Meters

Drilling Rig Anchor 100Meters

  • Drilling Rig Anchor 100Meters
  • Drilling Rig Anchor 100Meters
  • Drilling Rig Anchor 100Meters
  • Drilling Rig Anchor 100Meters

Drilling Rig Anchor 100Meters

    Payment Type: L/C,T/T,D/P
    Terms of Trade: FOB,CFR,CIF,EXW
    Min. Order: 1 Set/Sets
    Delivery Time: 7-15 Days
    Packaging: Standard package for export
    Productivity: 20 SETS PER MONTH
    Brand: HW
    Transportation: Ocean
    Place of Origin: Shandong China
    Supply Ability: 20 SETS PER MONTH
    Certificate: ISO
    Port: Qingdao Port,Tianjin,Shanghai

Basic Info

Model No.: MDL-80

Product Description

This model belongs to the full hydraulic gyrator type anchoring engineering drilling rig, which is mainly suitable for urban foundation pit support and control of building displacement, geological disaster management and other engineering construction.
The rig structure is monolithic with a track walking chassis and a grip Shackle. The crawler chassis moves quickly and the hole position is convenient; the clamping shackle can automatically remove the drill pipe and the casing, which reduces the labor intensity of the workers and improves the construction efficiency.

The whole machine introduction:

1. Cover: The installed cover makes the machine shape more scientific, and also protects the critical hydraulic components from contamination.

2,The legs: not only to protect the cylinder from damage, but also enhance the support strength.

3, The console: split-type console, making the operation easier, to avoid misuse.

4, Crawler: longer and stronger track, effectively prevent sagging, adapt to a wider range of strata.

5,( 57606023,optional) lift: adjustable aperture height, no longer depends on the level of the work surface.

6,( 57606024,optional) automatic turntable: free of manual labor, easier and more convenient.

7, Large through hole high pressure faucet: the necessary equipment to expand the head construction.

8. Power head: The rig rudder is driven by double hydraulic motor. The output torque is large, and the rotary center is lower than similar products, which greatly improves the balance of the drill drilling. The expansion joints are configured to greatly extend the life of the drill pipe.
HW Brand Professional Anchor Drilling Rigs and Anchoring Drilling Machines for Road and Dam Base MDL series

9. Heat Dissipation System: The heat dissipation system is optimized for the customer's local special working conditions to ensure that the maximum temperature does not exceed 70 °C when the outdoor temperature is 45 °C.



Product Parameters:

We also have Model MDL-150 and MDL-200, you can compare the details below:

MDL-80 MDL-150 MDL-200 Anchoring Rigs
Model MDL-80 MDL-150 MDL-200
Drill Diameter (mm) φ100-φ210 φ150-φ250 φ150-φ250
Drill Depth (m) 60-100 130-170 180-220
Pipe Diameter (mm) φ73/φ89/φ102/φ114 φ73/φ89/φ102/φ114 φ73/φ89/φ102/φ114
Drilling Angle (°) -10-90 0-90 0-90
Gyrator Output Rotary Speed (r/min) 16-105 10-170 40-170
Gyrator Output Torque (N.m) 4200 7500 11000
Gyrator Stroke (mm) 1800 3400 3400
Gyrator Lift (KN) 65 70 80
Gyrator Lifting Speed (m/min) 0-5 Adjustable/7/23/30 0-5 Adjustable/7/23/30 0-1.4 Adjustable/16/18
Gyrator Pressure (KN) 33 36 40
Gyrator Feeding Speed(m/min) 0-10 Adjustable/14/46/59 0-10 Adjustable/14/46/59 0-2.8 Adjustable /32/35
Driving Mode Crawler Optional Crawler Crawler
Travel Speed (km/h) 15 20 22
Diesel Input Power (KW) 39 96 117
Motor Input Power (KW) 30+1.5 55+18.5 55+30+2.2
Dimension L*W*H (mm) 3000*1800*1500 5400*2100*2000 6200*2100*2000
Weight (Kg) 1300 6500 9200

Packing&Shipping:

shipping





certificate

work shop


visit


exhibation

FAQ:

1.Are you factory?

A: We are factory and trading company,we are professional manufacturer of solar pile driver ,Highway guardrail pile driver,Hydraulic water well drilling rig,Pneumatic water well drilling rig etc.


2.What brand of the machinery can we supply?
A: HW, Sem, XCMG, ZGYX brand etc.


3.What kind terms of payment can be accepted?
A:Normally we can work on T/T term or L/C term.


4.What about the warranty time?
A:12 months after shipment, excluding wearing parts, We offer these parts with lowest price at any time.


5.How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock or it is 15-25 days if the goods are not in stock, it is according to quantity.


6.Our after services:
A:Our sales team will response for your question within 24 hours. (Holidays Excluded)
Technical support will be available at any time.
Free replacement will provide once the failure confirmed caused by our product quality.


7.Shipping way

A:By air or by sea as you required.



Shandong Hengwang Group Co., Ltd

 Shandong Hengwang Group is a science and industry integration enterprise which is located in the Jining city of Shandong Province-the hometown of Confucius and Mencius and the birthplace of Confucianism. Founded in 2011 with a registered capital of 50 million, Our company owns six wholly-owned subsidiaries which have 400 employees. Since its inception, relying on its strong scientific and technological strength, highly skilled management personnel, strict testing methods and exquisite division of labor and production, Shandong Hengwang Group dedicated to producing, research and development and sales of drilling equipment, construction machinery, and mining machinery.

Company Info

  • Company Name: Shandong Hengwang Group Co., Ltd
  • Representative: Mingtao Liu
  • Product/Service: Water well drilling rig , Pile Driver , DTH Drilling Rig , Bulldozer , Motor Grader , Wheel Loader
  • Capital (Million US $): 50,000,000RMB
  • Year Established: 2002
  • Total Annual Sales Volume (Million US $): Above US$100 Million
  • Export Percentage: 71% - 80%
  • Total Annual Purchase Volume (Million US $): Above US$100 Million
  • No. of Production Lines: Above 5
  • No. of R&D Staff: 21 -30 People
  • No. of QC Staff: 21 -30 People
  • OEM Services Provided: yes
  • Factory Size (Sq.meters): 10,000-30,000 square meters
  • Factory Location: Hengwang Science Park, Taibaihu New District, Jining City, Shandong Province, China (Mainland)
  • Contact Person: Ms. Maggie Wang
  • Tel: 86-021-58321600
Email to this supplier
  • *Subject:
  • To:

  • *Messages:
    Your message must be between 20-8000 characters